Thursday, November 10, 2011

Tied Down

The building sits on the water but in order to control the movement of the building with the change in water levels of the lake, i propose to fix it to the lakes bed with the use of post construction. Rather then have it floating and moving with the water and creating an un stable floor for people. Further reserch into water levels would help understand the movement of water and how high it will reach into the building. I do however want the exterior of the building to experience spashing of water at different times. Its beautiful and poetic to flow the water in and out.

No comments:

Post a Comment